zagatoes30
Member
- Messages
- 25,190
As per previous conversations a thread to capture those attempts to do things ourselves when we know we should have got the professionals in.


ATremendous job! Looks very professionally done. That should keep the missus happy (for a period)I'll start with my latest, what was planned for 2 months took 5 but importantly Mrs Z is happy
Before
View attachment 152338 View attachment 152339
View attachment 152340 View attachment 152341
After
View attachment 152342 View attachment 152343
View attachment 152344 View attachment 152345
View attachment 152346








Awesome work - very impressive!When we first moved into our cottage about 25 years ago, the driveway was concrete pin curb and pea gravel (I hated it). View attachment 152364
So it was replaced with a concrete cobble printed drive, this was (IMO) in keeping with the cottage and nottoo expensive. This has been down for approximately 20 years now, showing it's age and no longer aesthetically pleasing on the eye. So I decided to give it a re-vamp. I decided to paint individual cobbles sporadically in 2 shades of grey, using my artistic background, I painted the cobbles giving them some patina to fit in with the existing. I did this in about 10 different sections at a time to allow for cars being moved etc. I had to do this in 3 stages.
1. Deep power wash of each section.
2. Painting of the cobbles in 2 tones with a concrete paint.
3. Seal each section with a concrete based sealant.
View attachment 152365
View attachment 152366
View attachment 152367
View attachment 152368
We also had to have a new post fitted to replace the rotten one. The men that did this were Randolph Scott and Clint Eastwood, as instead of digging under the raft for the concrete pad, they decided to cut a big chunk out of the drive without consulting me.....They didn't get paid! So I did a bit o form work and unfilled with concrete trying to copy the cobble pattern.
View attachment 152369
It's taken me about 3 months with dodging weather, moving cars and holidays, but I finally completed it about 2 weeks ago!
Before
View attachment 152370
After
View attachment 152371





Dramatic difference.Here in France, we didn’t like the awful crimson red front and side doors on our house. Rather than just paint them a different colour, I came up with the idea of cladding them on the outside (and painting the inside) This also meant painting both door frames, inside and out. Since you can’t really leave front doors off during the night, it has taken quite some time to paint over the red, an absolute bugger to cover! Doors on, doors off.. and so on.
I finally hung the finished front door today and happy with the result. Side door tomorrow..
Before—>
View attachment 152401View attachment 152402
During—>
View attachment 152403
After —>
View attachment 152404View attachment 152405
Big job replacing 8 doors! Best of luck with it. I imagined doing both doors was enough, however, Mrs Bebs has now come up with another idea, cladding the wood store next to the front door identically as well..! I’ll leave that for next week I think…Dramatic difference.
I have to replace all the internal doors downstairs to get rid of the cheap pine the irish love so will be replacing them with ones similar to the kitchen door. Only issue there are 8 more to fit and paint along with all the skirting boards. I think we will be sick of doors by the time we finish.
In my first role in working life I spent 2 years fitting fire doors in Hospitals...if you have ever fitted one you know they are extremely heavy...I was managing 4 a day and my arms were like popeye's!Big job replacing 8 doors! Best of luck with it. I imagined doing both doors was enough, however, Mrs Bebs has now come up with another idea, cladding the wood store next to the front door identically as well..! I’ll leave that for next week I think…